Gypsum Subfloors is a Maxxon/Gyp-Crete authorized dealer for the greater New Orleans area.  They install Gyp-Crete gypsum floor underlayment, Level-Right self-leveling underlayment, and Acousti-Mat sound control systems

Project Spotlight

Project: Hyatt Regency New Orleans, New Orleans, LA
General Contractor: DonahueFavret Contractors, Mandeville, LA
WELBRO, Maitland, FL
Scope:
  • 40,000 sq. ft. of Level-Right poured at an average depth of 4".

    When Hurricane Katrina hit New Orleans, the Hyatt Regency New Orleans received heavy structural damage, forcing the hotel to shut its doors. In 2011 following extensive renovations, the hotel was able to reopen. One of the products that helped the project meet its tight 14-month schedule was Maxxon's Level-Right. Level-Right was poured at an average depth of 4" and was selected to level the atrium floor, which had sunk during the flooding. Level-Right was also poured in the restaurant on the top floor and in the elevator lobbies.

    Finished photos courtesy of TripAdvisor.

  • Gypsum Subfloors helped renovate the floors in this historic building in the French Quarter

     
    Gypsum Subfloors installed Dura-Cap in this historic renovation in New Orleans
    Gypsum Subfloors installed Dura-Cap in this historic renovation in New Orleans
     

     

     

     

     

     

     

     

     

     

    Project: The Muses Apartments; New Orleans, LA
    Architects: Weber Group, Louisville, KY
    Mathes Brierre Architects, New Orleans, LA
    Developers: LDG Development, Louisville, KY
    Gulf Coast Housing Partnership, New Orleans, LA
    Scope:
  • 225,000 sq. ft. of Gyp‐Crete 2000®/3.2K (550,000 sq. ft. upon project completion) poured at a depth of 3/4"

    The Muses is a large‐scale, multifamily, mixed income apartment development being built in part of New Orleans that was wiped out by Hurricane Katrina. The development, a 263‐unit apartment complex, will soon be certified as the first LEED® NC‐Silver multi‐family development in Louisiana. To achieve LEED® NC Silver Certification the developers paid careful attention to site selection, innovative energy use, and the usage of "green" building materials. Gyp‐Crete 2000/3.2K was used throughout the units, contributing valuable points toward LEED® project certification. Gyp‐Crete 2000/3.2K will also provide tenants with fire safety and added sound deadening.

    Photos courtesy of LDG & GCHP.

  • Gypsum Subfloors helped renovate the floors in this historic building in the French Quarter

     
    Gypsum Subfloors installed Dura-Cap in this historic renovation in New Orleans
     

    Gypsum Subfloors leveled pitted and trenched concrete floors

     

     

     

     

     

     

     

     

    Project:

    Audubon Building Renovation; New Orleans, LA
    Architect: Trapoline Architects
    Contractor: RP Carbone Construction
    Scope:
  • 2" of Dura-Cap poured over the pitted concrete floors, trenches, and old quarry tile

    A New Orleans landmark, the 95-year-old Audubon Building at 921 Canal Street, got a new life as a 201-room Hilton Hotel (now The Ritz-Carlton) in the historic French Quarter.  Some of the credit for the renovation goes to Maxxon dealer Gypsum Subfloors.  The 9-story building (over 85,000 square feet) was gutted and required a new, smooth surface for installation of floor goods. 
  • Gypsum Subfloors helped renovate the floors in this historic building in the French Quarter Gypsum Subfloors installed Dura-Cap in this historic renovation in New Orleans Gypsum Subfloors leveled pitted and trenched concrete floors

     

     

    Project: Wilson Warehouse; Baton Rouge, LA
    Contractor: Salco Construction, Inc.
    Scope:
  • 50,000 sq. ft. of Maxxon Overlayment poured at 1/4" over a concrete floor.

    A new concrete floor had developed surface scaling/flaking problems due to weather and/or finishing problems. Gypsum Subfloors was able to provide a solution to this floor challenge with Maxxon Overlayment.
  • Gypsum Subfloors is your Maxxon Gyp-Crete dealer in Louisiana, Mississippi, and Alabama   Level-Right WearTop was used to solve this floor challenge   Gypsum Subfloors poured WearTop over this problem concrete floor
             
    Maxxon's Level-Right WearTop leveled this concrete floor in Baton Rouge   Gypsum Subfloors, you authorized Maxxon dealer in Louisiana, Missippi, and Alabama, leveled this problem concrete floor with Level-Right WearTop   Gypsum Subfloors is your Maxxon gypsum floor underlayment dealer in Louisiana, Mississippi, and Alabama

     

     

     

     

     

     

     

     

     

     

    Project: Sleep Inn Hotels; Morgan City LA
    Contractor: Hi-Tech Commercial Contractors; Harvey, LA
    Scope:
  • 26,000 sq ft of Gyp-Crete 2000/3.2K, poured at ¾” over plywood subfloors

    Sleep Inn Hotels of Morgan City is one of a number of hotels in South-east Louisiana poured by Gypsum Subfloors for Hi-Tech Contractors

  •